#104/365 jelly beans

4 Comments

3kg of jelly beans at work!  shhh…..

#97/365 newsletter

3 Comments

the article i wrote for our company’s dec newsletter:

Work begins on Martin Place Station Upgrade this month which includes the construction of two new lifts, renovation of existing toilet facilities, provision of a Family Accessible Toilet, realignment of Ticket Gates and installation of Tactile indicators on the platform.

Access to site is a major concern –  Martin Place Station is among the busiest 10 stations on the CityRail network with around 38,000 commuters using it everyday. Major work activities such as excavation, concrete pours as well as materials deliveries could only be out of hours work. However, with the Lady Luck smiling on us, we discovered an access shaft from Martin Place street level down to the Machine Room which could be utilised as a material hoist to transport concrete and reo etc inside the train station easily without public impact.

A track possession weekend on Saturday the 12th and Sunday the 13th of December sees the installation of site shed on the mezzanine, excavation of a lift pit No.2 on the platform (pictures above) and relocation of the temporary GAC (Gate Access Controller) booth.

In January 2010, works of relocating ticket barriers and escalator controllers, tiling works and excavation of lift pit No.1 on the concourse are scheduled to happen. Arenco anticipates completion by end of 2010, hopefully before Christmas!

#96/365 上报

5 Comments

一个多月后的更新 我的新任务~
接下来的日子将会非常非常忙碌… stress ahh!!!

#84/365 春的嘉年华

1 Comment

明天 这里将会人潮汹涌

#82/365 bad day

2 Comments

路… 还有多远? 几时才能摆脱…

#76/365 累了

9 Comments

厌倦了这个行业…

#58/365 请多多指教

5 Comments

どうぞよろしくお願いします

#51/365 非请勿入

2 Comments

危险 非请勿入

#38/365 好伙伴

2 Comments

计算机 + 刻度尺 + 原子笔 三合一 我的工作好伙伴

project 365: #30 卅天

Leave a comment

30天前我仍在失业 30天后我出入这里

Older Entries

Follow

Get every new post delivered to your Inbox.